Pre-Engineered Steel Buildings Supplied, Constructed & Designed for your Commercial Construction Project

At STEVENS, we can provide advanced Metal Building Kits to streamline your next steel building project in Toledo, OH.

Pre-engineered metal building kits have unlimited, customizable options to make yours unique and one-of-a-kind.

The customizations and preference you decide on are what turn a standard metal building kit into your tailor-made metal building for a Government BuildingFood Manufacturing Building, Energy and Power Plant, or any other number of industrial building your business requires.

STEVENS uses customizable, high-quality pre-engineered metal buildings that have industry-leading capabilities and are constructed with American-made, recyclable Nucor steel. 

BEST PRE-ENGINEERED METAL BUILDING MANUFACTURER IN TOLEDO, OH

Having the best Metal Building Kits are important for the design and construction of a Government Building, Chemical Manufacturing Plant, Energy, and Power Plant. If you are looking for a reliable pre-engineered metal building manufacturer in Toledo, Ohio, STEVENS Engineers and Constructors can help create the space you need. We can provide you an advanced Metal Building Kit to streamline your next steel building project.

Pre-fabricated buildings are becoming the choice of more and more industries in Toledo because of the unlimited, customizable options they give you when expanding your business. If an operationally efficient and aesthetically-pleasing space is what you needed in your facility, these pre-engineered metal building kits will benefit your business.

Steel building kit construction Toledo, OH | STEVENS

Whether it’s for a Government Building, Chemical Manufacturing Plant, Energy, and Power Plant, or any other industrial building your business requires, our top-notch Metal Building Kits can be designed and constructed to cater to your unique business requirements. 

Read on to learn more about pre-engineered metal buildings and how STEVENS can help you construct a facility of this kind in Toledo, OH. 

WHY A PRE-ENGINEERED METAL BUILDING IS THE BEST CHOICE FOR YOU

Whether your metal service facility is involved in fabricating extra-long steel structures, or you’re operating a food and beverage manufacturing plant and need to expand your production capabilities, a pre-fabricated building can offer great benefits for your company.

As your partner in constructing buildings in Toledo, we at STEVENS promise you that you will get these benefits once you have chosen our pre-fabricated buildings:

  • An Aesthetically-Pleasing Design
  • Fully Customizable
  • Versatile and Flexible 
  • Fast and Efficient
  • Cost-Effective
  • Energy Efficient
  • Environmentally-Friendly

STEVENS has been providing excellent construction and building services for more than 70 years. Because of the experience and trust we have built, we can say that our service can be depended on.


STEVENS – Your Reliable Partner for Pre-Engineered Steel Buildings in Toledo

At STEVENS, we don’t just provide you with materials with great quality for your unique construction projects. We also offer services on designing, preparing the site, constructing, and physically erecting your metal building. 

Securing finances for building a new facility can be difficult, which is why it is essential for you to conduct thorough research and analysis to make sure your capital investments meet the target objectives of your business. 

STEVENS has the experience, workforce, resources, and expertise to:

  • Custom-design your metal building kit to your specific needs and preferences.
  • Manage the building project from development and design to erection and completion.
  • Construct your metal building kit and bring your building dreams to reality.

With the utilization of BIM, a 3D building modeling software, and Nucor steel, our Engineering and Construction Company can meet your needs for your Pre-Engineered Metal Building Project.

WHY NUCOR BUILDING SYSTEMS?Nucor Authorized Metal Building Partner Toledo, OH | STEVENS

Nucor provides STEVENS with high-grade All-American steel that is made of 80% recycled steel (and is 100% recyclable) that assures the quality of the products.

Nucor helps STEVENS build the sturdiest and most sustainable buildings across America. Buildings made with recyclable materials ultimately helps our clients adhere to an environmentally-minded business model. 

We apply Nucor’s F.O.C.U.S principles (Fits, On-time delivery, Competitive pricing, Unbeatable services, and Solutions that work) to every project we work on. 

The more than 4,000 pre-fabricated steel structures that Nucor completes yearly is a vivid assessment of their capabilities. For over 25 years, Nucor has been providing exceptional products and services to STEVENS.

HOW DOES BIM SOFTWARE BENEFIT MY PRE-ENGINEERED STEEL BUILDING?

Another benefit STEVENS offers is Building Information Modeling (BIM). BIM is an advanced 3D building modeling software that enables us to design your pre-engineered metal buildings

This advanced imaging tool helps our architects, designers, engineers, and project managers accurately visualize the design, plan, and execution of building projects. 

Our team is 100% sure that your prefabricated building is built for its intended function of spaciousness and functionality. BIM is a software program that identifies any potential hazards in the design structure so that problems can be prevented and solved before erection begins, helping to avoid costly setbacks later on in the project.

By utilizing the BIM software, STEVENS dedicated team can reassure you that they will complete your project within the promised time frame, within your chosen budget, and without any problems when the building is being erected. STEVENS can provide you with a full-service team to develop, design, and erect a metal building structure that follows every specification and requirement you (and your industry) have.

pre-engineered metal buildings near me Toledo, OH | STEVENS

Get Your Free Quote for your Pre-Engineered Metal Building in Toledo

STEVENS is dedicated to creating a meaningful relationship with our clients that is as strong as our prefabricated buildings, guaranteeing that we understand their specific needs and requirements for their pre-engineered metal building project. 

STEVENS develops and erects pre-engineered metal buildings that fit clients' needs and designs, while also meeting all local codes and requirements for industry-specific buildings. With our company, you will have a full-service construction team (design, engineering, project management, installation, erection, and completion) for your next steel building project.

No matter the size and functionality of the structure you would like built, STEVENS will give your company the most advanced metal building kits for your next steel building project in Toledo, Oh.

Click on the button below to Get a Free Quote for your next pre-engineered building in Toledo, Ohio, today!

Get a Quote

PROJECTS

  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings
  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings
  • PRECOAT
    PRECOAT
    Pre-Engineered Buildings
×
PRECOAT

Location: Weirton, West Virginia

As is often the case, there is much more to a “pre-engineered” building than the building itself.

In the case of Precoat Metals, the scope included providing the geotechnical reports, foundations, storm water, electrical, HVAC, and fire protection as well as obtaining all permits. The storm water piping consisted of 1000 lineal feet, crossing under two roads, to a retention pond.

The civil concrete included spread footers and grade walls and 23,000 square feet of floor slab poured to an FF 50/FL 50 finish specifications. This finish was critical to the owner’s plan to use remote controlled fork lifts for coil storage.

The building itself was 140’x120’ with an offset 70’x70’ attached by 2 tunnels 20’x20’ connecting the finishing line with the shipping building. The main building was 35’ high at the eave and 40 feet high to the ridge. The building also included 5’-0” skylights. The side walls consisted of 20,000 square feet of siding panels with 6” insulation. The building was covered by 23,500 square feet of standing seam roof, also with 6” insulation.

All work was performed to the owner’s satisfaction in terms of quality and schedule and cooperation within their operating facility. Most importantly, ZERO recordable accidents.

Categories :
Pre-Engineered Buildings
  • PPL BRUNNER ISLAND
    PPL BRUNNER ISLAND
    Pre-Engineered Buildings
×
PPL BRUNNER ISLAND

Location: York Haven, Pennsylvania

This client required an entire “brown field” waste water treatment facility to support their coal fired generation plant. Our scope included:

Waste Water Treatment Plant, Civil, Building and Site Work 2006

  • Buildings
    • Influent 70’ x 40’ x 60’ highFilter B
    • uilding 125’ x 75’ x 55’ high
    • Filter Extension (Pump Room) 95’ x 25’ x 15’ high
      • Underground Piping and Electrical
      • Coatings
        • Sumps and Building
        • Trenches Building
        • Tanks Area
        • Unloading Truck Area
          Mix Tank
        • Sludge Tanks
      • Steel Work
        • Clarifier Walkways
        • Mix Tank Platforms
        • Building Sump Platforms
      • Sludge Tank Platforms
        • Site Work
        • Roads
        • Fencing
        • Site Re-grading
        • Storm Water
Categories :
Pre-Engineered Buildings