Industrial Construction and Engineering

Backed by over 75 years of experience, commitment and quality, the STEVENS family of companies strives to be the preferred industrial engineer and constructor of choice.

BUILDING ON
EXPERIENCE. COMMITMENT. QUALITY.

STEVENS Engineers & Constructors is a team of dedicated professionals supported by trained and experienced craftsmen.

The Industrial Construction and Engineering industry is built and delivered on the foundation of transparency, honesty, and integrity our customers have come to expect.


 

OUR PROJECTS AND CAPABILITIES

  • SITE WORK & EXCAVATION
    SITE WORK & EXCAVATION
    Kinder Morgan
  • SHEET & H-PILE
    SHEET & H-PILE
    Williams Union Boiler
  • CIVIL CONCRETE
    CIVIL CONCRETE
    PPL BRUNNER ISLAND
×
Site Work and Excavation | Kinder Morgan
Site Work and Excavation | Kinder Morgan
SITE WORK & EXCAVATION

STEVENS Engineers & Constructors are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale. 

Our skillset includes:

  • Relocating Utilities
  • Backfill
  • De-Watering
  • Foundation Work
  • Clearing Land
  • Grading
  • Driveways
  • Walkways
  • Excavation
  • Septic & Sewer Systems
  • Permitting & More

We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.

One of the classical site work and excavation projects in  STEVENS' portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.

Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.

A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. STEVENS worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.

To learn how STEVENS can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.

Categories :
Kinder Morgan
×
Sheet and H Pile | Williams Union Boiler
Sheet and H Pile | Williams Union Boiler
SHEET & H-PILE

STEVENS has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.

STEVENS completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.

In one of our exemplary Sheet & H-pile projects, STEVENS  installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices. 

We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.

We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.

Categories :
Williams Union Boiler
×
Civil Concrete Services | PPL Brunner Island
Civil Concrete Services | PPL Brunner Island
CIVIL CONCRETE

STEVENS is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients. 

We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.  

One exceptional civil concrete project that STEVENS handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile. 

The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours, and injecting the pour site with liquid nitrogen. 

In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.

Categories :
PPL BRUNNER ISLAND
  • STEEL ERECTION
    STEEL ERECTION
    Allegheny Energy
  • HEAVY RIGGING
    HEAVY RIGGING
    Fort Beeler
  • EQUIPMENT SETTING & PRECISION ALIGNMENT
    EQUIPMENT SETTING & PRECISION ALIGNMENT
    Foundation Modification and Installation
×
Steel Erection | Allegheny Energy
Steel Erection | Allegheny Energy
STEEL ERECTION

As one of the most hazardous construction occupations in the U.S., STEVENS takes extensive measures to ensure the safety of all crew members on a steel erection project. 

We prioritize safety while adhering to the highest standards for efficiency and quality. 

In a showcase steel erection project, STEVENS subcontracted with Black & Veatch to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined-cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations. 

A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. STEVENS adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on time.

Categories :
Allegheny Energy
×
Heavy Rigging | Fort Beeler
Heavy Rigging | Fort Beeler
HEAVY RIGGING

Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. STEVENS brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible. 

Our experienced riggers take time to understand your project's unique challenges and work tirelessly to ensure your project plan is completed safely and on time.

Our Fort Beeler contract was a classic heavy rigging undertaking for STEVENS. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications. 

We also completed hydro-excavating, installed 1,000 cy of concrete, and fabricated and installed 100 tons of steel. 

STEVENS coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction. 

STEVENS offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.

Categories :
Fort Beeler
×
Equipment Setting & Precision Alignment
Equipment Setting & Precision Alignment
EQUIPMENT SETTING & PRECISION ALIGNMENT

STEVENS has decades of experience completing equipment setting and precision alignment projects for industrial clients.

We are driven by a passion for helping expanding businesses meet their growing client demands. 

Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.

We are also committed to responsive, clear communication, and the highest standards for safety and efficiency to minimize process line shutdown time during construction.

Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.

STEVENS showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations. 

Our scope of work involved:

Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease

STEVENS utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines. 

Categories :
Foundation Modification and Installation
  • PRE-ENGINEERED BUILDINGS
    PRE-ENGINEERED BUILDINGS
    Precoat Metals
  • PIPE FABRICATION
    PIPE FABRICATION
    ArcelorMittal - Indiana Harbor West
  • PIPE INSTALLATION
    PIPE INSTALLATION
    Burns Harbor
×
Pre-Engineered Buildings | Precoat Metals
Pre-Engineered Buildings | Precoat Metals
PRE-ENGINEERED BUILDINGS

Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization. 

STEVENS is proud to offer high-quality, pre-engineered steel buildings through our wholly-owned subsidiary, CDMG, a manufacturer's representative from Nucor Building Systems. 

CDMG helps clients customize their facility to suit their exact needs, and STEVENS builds the facility for longevity and function. 

In a showcase project of our metal building capabilities, STEVENS completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.

Our scope of work also included:

  • Geotechnical reports
  • Spread Footers
  • Grade Walls
  • 23,000 square feet of floor slab
  • 1000 feet of stormwater piping
  • Electrical
  • HVAC
  • Fire Protection
  • Permitting

We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.

Learn how STEVENS can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.

Categories :
Precoat Metals
×
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
PIPE FABRICATION

From our in-house, 32,000 square foot fabrication shop, STEVENS has the capacity to produce 10,000LF of pipe each month in a variety of sizes.

We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.

We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.

One of STEVENS' pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.

Over five months, STEVENS scope of work included:

  1. Extensive modifications to existing foundations
  2. Heavy rigging
  3. Precision level and alignment for a new slab caster
  4. Refurbishing equipment, from the tundish to the cut off machine, with minimal engineering
  5. Spray Chamber piping
  6. Field Routing and Installing water, grease, air, and hydraulic

Learn how STEVENS can leverage our capabilities to benefit your pipe fabrication project.

Categories :
ArcelorMittal - Indiana Harbor West
×
Pipe Installation | Burns Harbor Indiana
Pipe Installation | Burns Harbor Indiana
PIPE INSTALLATION

STEVENS Engineers & Constructors takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.

In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.

For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, STEVENS implemented a variety of pipes, including:

  • Carbon steel
  • 316 stainless
  • 20” to ¾”
  • Standard to XXS

All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.

Learn more about STEVENS Pipe Installation capabilities for your upcoming project.  

Categories :
Burns Harbor
  • SITE WORK & EXCAVATION
    SITE WORK & EXCAVATION
    Kinder Morgan
  • SHEET & H-PILE
    SHEET & H-PILE
    Williams Union Boiler
×
Site Work and Excavation | Kinder Morgan
Site Work and Excavation | Kinder Morgan
SITE WORK & EXCAVATION

STEVENS Engineers & Constructors are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale. 

Our skillset includes:

  • Relocating Utilities
  • Backfill
  • De-Watering
  • Foundation Work
  • Clearing Land
  • Grading
  • Driveways
  • Walkways
  • Excavation
  • Septic & Sewer Systems
  • Permitting & More

We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.

One of the classical site work and excavation projects in  STEVENS' portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.

Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.

A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. STEVENS worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.

To learn how STEVENS can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.

Categories :
Kinder Morgan
×
Sheet and H Pile | Williams Union Boiler
Sheet and H Pile | Williams Union Boiler
SHEET & H-PILE

STEVENS has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.

STEVENS completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.

In one of our exemplary Sheet & H-pile projects, STEVENS  installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices. 

We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.

We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.

Categories :
Williams Union Boiler
  • CIVIL CONCRETE
    CIVIL CONCRETE
    PPL BRUNNER ISLAND
  • STEEL ERECTION
    STEEL ERECTION
    Allegheny Energy
×
Civil Concrete Services | PPL Brunner Island
Civil Concrete Services | PPL Brunner Island
CIVIL CONCRETE

STEVENS is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients. 

We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.  

One exceptional civil concrete project that STEVENS handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile. 

The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours, and injecting the pour site with liquid nitrogen. 

In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.

Categories :
PPL BRUNNER ISLAND
×
Steel Erection | Allegheny Energy
Steel Erection | Allegheny Energy
STEEL ERECTION

As one of the most hazardous construction occupations in the U.S., STEVENS takes extensive measures to ensure the safety of all crew members on a steel erection project. 

We prioritize safety while adhering to the highest standards for efficiency and quality. 

In a showcase steel erection project, STEVENS subcontracted with Black & Veatch to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined-cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations. 

A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. STEVENS adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on time.

Categories :
Allegheny Energy
  • HEAVY RIGGING
    HEAVY RIGGING
    Fort Beeler
  • EQUIPMENT SETTING & PRECISION ALIGNMENT
    EQUIPMENT SETTING & PRECISION ALIGNMENT
    Foundation Modification and Installation
×
Heavy Rigging | Fort Beeler
Heavy Rigging | Fort Beeler
HEAVY RIGGING

Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. STEVENS brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible. 

Our experienced riggers take time to understand your project's unique challenges and work tirelessly to ensure your project plan is completed safely and on time.

Our Fort Beeler contract was a classic heavy rigging undertaking for STEVENS. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications. 

We also completed hydro-excavating, installed 1,000 cy of concrete, and fabricated and installed 100 tons of steel. 

STEVENS coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction. 

STEVENS offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.

Categories :
Fort Beeler
×
Equipment Setting & Precision Alignment
Equipment Setting & Precision Alignment
EQUIPMENT SETTING & PRECISION ALIGNMENT

STEVENS has decades of experience completing equipment setting and precision alignment projects for industrial clients.

We are driven by a passion for helping expanding businesses meet their growing client demands. 

Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.

We are also committed to responsive, clear communication, and the highest standards for safety and efficiency to minimize process line shutdown time during construction.

Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.

STEVENS showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations. 

Our scope of work involved:

Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease

STEVENS utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines. 

Categories :
Foundation Modification and Installation
  • PRE-ENGINEERED BUILDINGS
    PRE-ENGINEERED BUILDINGS
    Precoat Metals
  • PIPE FABRICATION
    PIPE FABRICATION
    ArcelorMittal - Indiana Harbor West
×
Pre-Engineered Buildings | Precoat Metals
Pre-Engineered Buildings | Precoat Metals
PRE-ENGINEERED BUILDINGS

Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization. 

STEVENS is proud to offer high-quality, pre-engineered steel buildings through our wholly-owned subsidiary, CDMG, a manufacturer's representative from Nucor Building Systems. 

CDMG helps clients customize their facility to suit their exact needs, and STEVENS builds the facility for longevity and function. 

In a showcase project of our metal building capabilities, STEVENS completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.

Our scope of work also included:

  • Geotechnical reports
  • Spread Footers
  • Grade Walls
  • 23,000 square feet of floor slab
  • 1000 feet of stormwater piping
  • Electrical
  • HVAC
  • Fire Protection
  • Permitting

We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.

Learn how STEVENS can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.

Categories :
Precoat Metals
×
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
PIPE FABRICATION

From our in-house, 32,000 square foot fabrication shop, STEVENS has the capacity to produce 10,000LF of pipe each month in a variety of sizes.

We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.

We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.

One of STEVENS' pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.

Over five months, STEVENS scope of work included:

  1. Extensive modifications to existing foundations
  2. Heavy rigging
  3. Precision level and alignment for a new slab caster
  4. Refurbishing equipment, from the tundish to the cut off machine, with minimal engineering
  5. Spray Chamber piping
  6. Field Routing and Installing water, grease, air, and hydraulic

Learn how STEVENS can leverage our capabilities to benefit your pipe fabrication project.

Categories :
ArcelorMittal - Indiana Harbor West
  • PIPE INSTALLATION
    PIPE INSTALLATION
    Burns Harbor
×
Pipe Installation | Burns Harbor Indiana
Pipe Installation | Burns Harbor Indiana
PIPE INSTALLATION

STEVENS Engineers & Constructors takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.

In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.

For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, STEVENS implemented a variety of pipes, including:

  • Carbon steel
  • 316 stainless
  • 20” to ¾”
  • Standard to XXS

All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.

Learn more about STEVENS Pipe Installation capabilities for your upcoming project.  

Categories :
Burns Harbor
  • SITE WORK & EXCAVATION
    SITE WORK & EXCAVATION
    Kinder Morgan
×
Site Work and Excavation | Kinder Morgan
Site Work and Excavation | Kinder Morgan
SITE WORK & EXCAVATION

STEVENS Engineers & Constructors are fully equipped with the industry experience and heavy earthmoving equipment to complete site work and excavation on any scale. 

Our skillset includes:

  • Relocating Utilities
  • Backfill
  • De-Watering
  • Foundation Work
  • Clearing Land
  • Grading
  • Driveways
  • Walkways
  • Excavation
  • Septic & Sewer Systems
  • Permitting & More

We tailor each of our projects according to client specifications and national regulations for safety and environmental impact.

One of the classical site work and excavation projects in  STEVENS' portfolio is the Scio Meter Station Earthwork project for Kinder Morgan. We utilized drone technology with on-site engineering to efficiently relocate more than 60,000 cy of dirt.

Our construction team adhered to all local, state and federal regulations for environmental protection and permitting and took special measures to control sediment and prevent erosion. We completed the project using CAT 740 articulating dumps, excavators, rollers, and backhoes. We utilized engineered air bridges to provide safe passage across existing pipelines for our heavy machines — these airbridges allowed for a continual flow of traffic that led to highly efficient excavation and backfill.

A highlight from the project was excavating and transporting the spoils of pad one to pad two for immediate placement for backfill. STEVENS worked with on-site, third-party inspectors and Kinder Morgan to meet and exceed all project specifications.

To learn how STEVENS can leverage our decades of industrial construction experience to benefit the earthmoving phase of your project, go to Site Work and Excavation.

Categories :
Kinder Morgan
  • SHEET & H-PILE
    SHEET & H-PILE
    Williams Union Boiler
×
Sheet and H Pile | Williams Union Boiler
Sheet and H Pile | Williams Union Boiler
SHEET & H-PILE

STEVENS has years of successful experience installing H-pile for deep foundation applications. Utilizing the latest pile driving equipment, we drive H-Pile beams into the earth to provide structural support to foundations and sheet pile walls for a variety of industrial clients.

STEVENS completes geotechnical testing as-needed for soil stability and other factors to identify the structural requirements for each project. We understand how to leverage the durability of H-Pile to secure facilities located in challenging soil conditions and active seismic areas.

In one of our exemplary Sheet & H-pile projects, STEVENS  installed the foundation support H-Piling for the cutting-edge Dresden Energy Facility owned and operated by Dominion Energy. The scope of work for this combined cycle power plant involved excavating 19,000 cy and installing 1712 pile, 85,300 LF, and 200 splices. 

We completed the excavation in the winter despite severe weather conditions, which allowed us to begin the foundations in early spring and erect the equipment over the summer. We met the proposed 7-week schedule by utilizing 3 pile driving rigs.

We completed the project with impressive results and an outstanding safety standard which secured a subsequent contract with Dresden Energy for facility foundations. Learn more about our Sheet & H-Pile capabilities.

Categories :
Williams Union Boiler
  • CIVIL CONCRETE
    CIVIL CONCRETE
    PPL BRUNNER ISLAND
×
Civil Concrete Services | PPL Brunner Island
Civil Concrete Services | PPL Brunner Island
CIVIL CONCRETE

STEVENS is equipped to handle a wide range of civil concrete projects with unique specification requirements. From quantity to temperature and deadlines, our team is experienced with making the impossible happen for our industrial clients. 

We have extensive experience with foundation work and will accommodate other site demands for concrete all according to facility demands.  

One exceptional civil concrete project that STEVENS handled was PPL Brunner Island. This project was just one of many power industry contracts but involved a few twists. Subcontracted by Shaw, we completed 36,500 cy of excavation, 10,500 cy mass pours of foundations, and we outsourced 8,000 LF of H- pile. 

The main challenge we faced was completing all mass pours at an exact 72-degree Fahrenheit temperature, limiting our project deadline to a matter of weeks. Through creative problem-solving and utilizing our many resources, we met the temperature requirement by building our own batch plant on-site, chilling aggregate, substituting ice for water, scheduling overnight pours, and injecting the pour site with liquid nitrogen. 

In the end, we successfully placed 10,500 cy of mass pour concrete, with an additional 11,000 cy to delight our client and exceed expectations. Learn more about our Civil Concrete Services.

Categories :
PPL BRUNNER ISLAND
  • STEEL ERECTION
    STEEL ERECTION
    Allegheny Energy
×
Steel Erection | Allegheny Energy
Steel Erection | Allegheny Energy
STEEL ERECTION

As one of the most hazardous construction occupations in the U.S., STEVENS takes extensive measures to ensure the safety of all crew members on a steel erection project. 

We prioritize safety while adhering to the highest standards for efficiency and quality. 

In a showcase steel erection project, STEVENS subcontracted with Black & Veatch to erect a control building, generation building, combustion turbine building, pump building, and water treatment building for a combined-cycle facility in Springdale, Pennsylvania. In addition to erecting these 5 facilities, we also performed substantial excavation work and installed foundations. 

A unique aspect of the project involved setting a bridge tress that was assembled on-site. Because of our extensive resources available through our family of companies, we had an adjustable spreader beam designed to raise and secure the bridge tress. STEVENS adhered to the highest standards for safety and efficiency for the duration of this portion of the project, allowing us to finish safely and on time.

Categories :
Allegheny Energy
  • HEAVY RIGGING
    HEAVY RIGGING
    Fort Beeler
×
Heavy Rigging | Fort Beeler
Heavy Rigging | Fort Beeler
HEAVY RIGGING

Heavy lifting and rigging projects involve high risks and dangerous maneuvering with thousands of pounds. If mistakes happen, it can cost a fortune, not to mention the risk of injury or death. STEVENS brings a wealth of heavy rigging knowledge to every project we take on. We are committed to careful planning and adhere to the highest standards for safety possible. 

Our experienced riggers take time to understand your project's unique challenges and work tirelessly to ensure your project plan is completed safely and on time.

Our Fort Beeler contract was a classic heavy rigging undertaking for STEVENS. Subcontracted by Williams, we fabricated and erected a 200-foot flare stack and successfully set all equipment according to industry and client specifications. 

We also completed hydro-excavating, installed 1,000 cy of concrete, and fabricated and installed 100 tons of steel. 

STEVENS coordinated engineers, laborers, manufacturers, and experienced field personnel to deliver an efficient, on-time project to the client's satisfaction. 

STEVENS offers specialized rigging solutions for the complex lifting needs of your project, including a wide range of in-house rigging equipment. Find out how our heavy rigging capabilities can benefit your upcoming project.

Categories :
Fort Beeler
  • EQUIPMENT SETTING & PRECISION ALIGNMENT
    EQUIPMENT SETTING & PRECISION ALIGNMENT
    Foundation Modification and Installation
×
Equipment Setting & Precision Alignment
Equipment Setting & Precision Alignment
EQUIPMENT SETTING & PRECISION ALIGNMENT

STEVENS has decades of experience completing equipment setting and precision alignment projects for industrial clients.

We are driven by a passion for helping expanding businesses meet their growing client demands. 

Our advanced process equipment and technical experience set us apart from other contractors who provide similar services. We are equipped to set and align the most sophisticated machinery on the market today.

We are also committed to responsive, clear communication, and the highest standards for safety and efficiency to minimize process line shutdown time during construction.

Our team offers relocation services to help our customers integrate their new equipment into current production lines or start from scratch and move an entire process line to a new facility.

STEVENS showcased our technical abilities for a client over a 4-year period that involved equipment setting, including rigging, leveling, and alignment, as well as multiple foundation alterations and installations. 

Our scope of work involved:

Cooling beds
Stretch reducing mill
New roll lathes
Electrical control room
Charging machines at a rotary furnace
Jib cranes
Miscellaneous platforms and walkways
New water
Air and hydraulics for piping
Grease

STEVENS utilizes robotic total station equipment and precision laser alignment to reduce damage to bearings and seals while reducing energy consumption for equipment processes. Learn how our alignment procedures can increase your company's production and the lifespan of your machines. 

Categories :
Foundation Modification and Installation
  • PRE-ENGINEERED BUILDINGS
    PRE-ENGINEERED BUILDINGS
    Precoat Metals
×
Pre-Engineered Buildings | Precoat Metals
Pre-Engineered Buildings | Precoat Metals
PRE-ENGINEERED BUILDINGS

Pre-engineered metal buildings offer flexibility for expansion, rapid construction time, and unlimited options for customization. 

STEVENS is proud to offer high-quality, pre-engineered steel buildings through our wholly-owned subsidiary, CDMG, a manufacturer's representative from Nucor Building Systems. 

CDMG helps clients customize their facility to suit their exact needs, and STEVENS builds the facility for longevity and function. 

In a showcase project of our metal building capabilities, STEVENS completed the comprehensive construction for a unique pre-engineered building for Precoat Metals. The 140’x120’ building connects to a 70’x70’ structure using two 20’x20’ tunnels. The project involved 20,000 square feet of siding and 23,500 square feet of standing seam roof.

Our scope of work also included:

  • Geotechnical reports
  • Spread Footers
  • Grade Walls
  • 23,000 square feet of floor slab
  • 1000 feet of stormwater piping
  • Electrical
  • HVAC
  • Fire Protection
  • Permitting

We utilized our industry experience and field expertise to finish the floor slab to FF 50/FL 50 specifications enabling the client to operate a coil storage facility using automated forklifts.

Learn how STEVENS can construct your pre-engineered steel building with the highest standards for quality, functionality, and safety.

Categories :
Precoat Metals
  • PIPE FABRICATION
    PIPE FABRICATION
    ArcelorMittal - Indiana Harbor West
×
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
Pipe Fabrication | ArcelorMittal - Indiana Harbor West
PIPE FABRICATION

From our in-house, 32,000 square foot fabrication shop, STEVENS has the capacity to produce 10,000LF of pipe each month in a variety of sizes.

We utilize the latest pipe fabrication technology, tooling, cutting, welding, and mandrel benders to efficiently turn out fabricated pipe according to quality control and local and national standards.

We offer hydrostatic testing, documentation, chemical cleaning and flushing, and protective coating options.

One of STEVENS' pipe fabrication project highlights involved a Slab Caster Upgrade at ArcelorMittal in Indiana.

Over five months, STEVENS scope of work included:

  1. Extensive modifications to existing foundations
  2. Heavy rigging
  3. Precision level and alignment for a new slab caster
  4. Refurbishing equipment, from the tundish to the cut off machine, with minimal engineering
  5. Spray Chamber piping
  6. Field Routing and Installing water, grease, air, and hydraulic

Learn how STEVENS can leverage our capabilities to benefit your pipe fabrication project.

Categories :
ArcelorMittal - Indiana Harbor West
  • PIPE INSTALLATION
    PIPE INSTALLATION
    Burns Harbor
×
Pipe Installation | Burns Harbor Indiana
Pipe Installation | Burns Harbor Indiana
PIPE INSTALLATION

STEVENS Engineers & Constructors takes on pipe installation projects that many other companies won't even consider. With experience, commitment, and quality in mind, we strive for a thorough understanding of project specifications to deliver a successful, long-lasting pipe install every time.

In a showcase of our pipe installation capabilities, we fabricated and installed nearly 40,000 LF of stainless piping between two new continuous casters for Burns Harbor in Northwest Indiana. From material procurement to facility start-up, we completed this project in less than three months, owing in large part to our tip-tig welders and bending capabilities.

For this same project, we completed well over 2,000 heli-arc welds for an upgrade outage of molds and oscillators on an existing caster. To meet project demands, STEVENS implemented a variety of pipes, including:

  • Carbon steel
  • 316 stainless
  • 20” to ¾”
  • Standard to XXS

All work for the existing caster was completed in just ten days according to B31.1 code and without a single rejected weld.

Learn more about STEVENS Pipe Installation capabilities for your upcoming project.  

Categories :
Burns Harbor

Testimonials

Kinder Morgan Utopia Pipeline Project Review for Stevens Engineers and Constructors Project ManagerKinder Morgan

STEVENS performed a very difficult earth moving project for the Utopia Pipeline successfully. Steep terrain, sensitive environmental areas, and several air bridges were built across multiple pipelines to safely move dirt from one area to another. All work was done safely and without incident. All personnel were professional and adapted to the changing weather and site conditions very well.

J&L Specialty Steel Testimonial for Stevens Work on a Process Line J&L Specialty Steel

Crucial to our future in the specialty steel industry, STEVENS’ work to improve our process line and tank farms for J&L Specialty Steel’s DRAP Pre-pickling Project is better than we had hoped. We’re impressed with the outcome and look forward to working together on future projects.

Project Manager at Nova Chemicals give 5 star review of Stevens Engineers and Constructors Project ManagerNova Chemicals

Just wanted to give a heads up to you on the great job done by STEVENS on our Lime Containment project. Big thanks to Kevin, Andy, Carey and Wayne for their hard work and commitment to keeping it a safe worksite. Hope to work with you and them again in the future.